Humble Sign | 20,000 SF Office/Warehouse | Humble, TX

 

4.25.18 - The building is sheeted and trimwork on the warehouse is complete,

HumbleSign4.25.18 4

HumbleSign4.25.18
4.06.18 - Crewmen have progressed to sheeting the building,

 humblesign4.06.18 2

humblesign4.06.18

4.02.18 - Crewmen continue to hang steel,

HumbleSign4.02.18 2

HumbleSign4.02.18 3

HumbleSign4.02.18 4

HumbleSign4.02.18 5

HumbleSign4.02.18 6

HumbleSign4.02.18

3.27.18 - Crewmen began unloading and erecting steel,

humblesign 3.27.18 5

humblesign 3.27.18 6

humblesign 3.27.18 7

humblesign 3.27.18